Import terminal · Bà Rịa–Vũng Tàu, Vietnam
Thi Vai LNG Terminal
Thi Vai LNG Terminal is an operating LNG import terminal in Bà Rịa–Vũng Tàu, Vietnam. The tracker lists 3 tracked units with 9.5 Mtpa operating, 5.76 Mtpa proposed, the earliest starting in 2023. It is owned by LNG Vietnam.
Operating
9.5 Mtpa
12.9 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
5.76 Mtpa
7.83 bcm/y · 2 units
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Operating | 9.5 | 12.9 | 2023 | — | Not reported | LNG Vietnam [100%] |
| Unit Phase 2 | Proposed | 2 | 2.72 | — | — | Not reported | LNG Vietnam [100%] |
| Unit Vung Tau FSRU | Proposed | 3.76 | 5.11 | — | — | Not reported | LNG Vietnam [100%] |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- LNG Vietnam100%
Operators
Location
Thi Vai LNG Terminal at 10.5263° N, 107.0275° E, with 5 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 10.5263° N, 107.0275° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Thi Vai Import Terminal Gas Pipeline | Operating | 12 km | 4.5 bcm/y | 2.2 km | route proximity |
| Son My–Phu My Gas Pipeline | Proposed | 85 km | 9 bcm/y | 7.5 km | route proximity |
| Nam Con Son 2 Gas Pipeline | Operating | 141 km | 6.72 bcm/y | 10 km | route proximity |
| Nam Con Son Gas Pipeline | Operating | 370 km | 7 bcm/y | 10 km | route proximity |
| Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline | Operating | 40 km | 2 bcm/y | 22.4 km | route proximity |