Gas transmission pipeline · Sangachal Terminal to Kulevi
Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI)
Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) is a cancelled gas transmission pipeline crossing Azerbaijan, Georgia. The tracker lists 1 tracked segment, 920 km long and 8 bcm/y of capacity, starting up in 2027. It runs from Sangachal Terminal to Kulevi. Owners include SNGN RomGaz SA, Government of Azerbaijan, Georgian Oil and Gas Corp and 1 more.
Length
920 km
Capacity
8 bcm/y
5.9 Mtpa LNG equivalent
Segments tracked
1
Route
Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) runs from Sangachal Terminal to Kulevi. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sangachal Terminal
- To
- Kulevi
- Start country
- Azerbaijan
- End country
- Georgia
- Countries crossed
- Azerbaijan, Georgia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 692 km
- GEM pipeline ID
- P0735
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Sangachal Terminal → Kulevi | 920 | 8 | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Kulevi LNG Terminal | Georgia | Import | Cancelled | 1.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.