LNG Chain

Gas transmission pipeline · Ciecierzyce to Lwówek

Baltic Pipe Project

Baltic Pipe Project is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 69 km long, starting up in 2022. It runs from Ciecierzyce to Lwówek. It is owned by Gaz-System.

Length

69 km

Capacity

Not reported

Segments tracked

1

Largest diameter 991 mm (39 in)

Route

Baltic Pipe Project runs from Ciecierzyce to Lwówek. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ciecierzyce
To
Lwówek
Start country
Poland
End country
Poland
Countries crossed
Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
175 km
GEM pipeline ID
P2266
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Goleniów-Lwówek Gas Pipeline (Stage 2)OperatingCiecierzyce → Lwówek69Not reported991 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Polish Baltic Sea Coast FSRUPolandImportUnder constructionname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.