LNG Chain

Gas transmission pipeline · Villa Montes to Capital district

Bolivia–Paraguay Gas Pipeline

Bolivia–Paraguay Gas Pipeline is a shelved gas transmission pipeline crossing Bolivia, Paraguay. The tracker lists 1 tracked segment, 900 km long and 2.17 bcm/y of capacity, starting up in 2024. It runs from Villa Montes to Capital district. It is owned by YPFB and Petróleos Paraguayos.

Length

900 km

Capacity

2.17 bcm/y

1.6 Mtpa LNG equivalent

Segments tracked

1

Route

Bolivia–Paraguay Gas Pipeline runs from Villa Montes to Capital district. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Villa Montes
To
Capital district
Start country
Bolivia
End country
Paraguay
Countries crossed
Bolivia, Paraguay
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
783 km
GEM pipeline ID
P2714
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineShelvedVilla Montes → Capital district9002.172024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.