Country
Bolivia: LNG infrastructure
Bolivia has 20 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
no import terminal tracked
Pipelines
20
9,664 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
Gas pipelines crossing Bolivia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Alto Beni-Caranavi Gas PipelineMayaya gas field → Caranavi power station | Bolivia | Proposed | 45 km | 0.51 bcm/y | 1 | — |
| Bolivia–Paraguay Gas PipelineVilla Montes → Capital district | Bolivia, Paraguay | Shelved | 900 km | 2.17 bcm/y | 1 | 2024 |
| Bolivia–Peru Gas PipelineRío Grande → Moquegua | Bolivia, Peru | Shelved | 900 km | 3.61 bcm/y | 1 | — |
| Caranda-Colpa Gas PipelineCaranda → Colpa | Bolivia | Operating | 33 km | 0.05 bcm/y | 1 | — |
| Carrasco-Cochabamba Gas PipelineCarrasco → Cochabamba | Bolivia | Operating | 250 km | 1.23 bcm/y | 1 | 2008 |
| Carrasco-Yapacaní Gas PipelineCarrasco → Yapacaní | Bolivia | Operating | 76 km | 1.36 bcm/y | 1 | 1995 |
| Carrasco-Yapacaní Gas PipelineIchilo → Carrasco | Bolivia | Operating | 30 km | 0.31 bcm/y | 1 | 2020 |
| Colpa-Rio Grande Gas PipelineColpa → Rio Grande | Bolivia | Operating | 88 km | 2.5 bcm/y | 1 | 1972 |
| Colpa-Warnes-Mineros Gas PipelineColpa → Warnes | Bolivia | Operating | 16 km | 1.18 bcm/y | 1 | 2016 |
| Colpa-Warnes-Mineros Gas PipelineColpa → Mineros | Bolivia | Operating | 64 km | 0.16 bcm/y | 1 | — |
| Cuiabá PipelineSan José de Chiquitos → Cuiaba | Bolivia, Brazil | Operating | 645 km | 1.02 bcm/y | 1 | 2002 |
| GASBOL Gas PipelineRío Grande → Canoas | Bolivia, Brazil | Operating | 3,150 km | 11 bcm/y | 1 | 1999 |
| Gasoducto al Altiplano Gas PipelineSanta Cruz → La Paz | Bolivia | Operating | 1,181 km | 0.69 bcm/y | 1 | 1988 |
| Juana Azurduy Gas PipelineCampo Grande (Yacuiba) → Campo Durán | Bolivia, Argentina | Operating | 52 km | 0.28 bcm/y | 1 | 2011 |
| Mineros-San Ramón Gas PipelineMineros → San Ramón | Bolivia | Operating | 99 km | 0.02 bcm/y | 1 | 1997 |
| Taquiperenda-Sucre-Potosí-Cochabamba Gas PipelineTaquiperenda → Cochabamba | Bolivia | Operating | 901 km | 0.22 bcm/y | 1 | — |
| Villamontes-Tarija Gas PipelineVillamontes → Tarija | Bolivia | Operating | 142 km | 0.65 bcm/y | 1 | — |
| Yabog Gas PipelineRío Grande → Yacuíba | Bolivia, Argentina | Operating | 540 km | 2.19 bcm/y | 1 | 1972 |
| Yacuíba-Río Grande Gas PipelineYacuíba → Río Grande | Bolivia | Operating | 432 km | 7.3 bcm/y | 1 | 2003 |
| Yapacani-Colpa Gas PipelineYapacani → Colpa | Bolivia | Operating | 120 km | 1.92 bcm/y | 1 | 1994 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.