LNG Chain

Gas transmission pipeline · Carrasco to Yapacaní

Carrasco-Yapacaní Gas Pipeline

Carrasco-Yapacaní Gas Pipeline is an operating gas transmission pipeline in Bolivia. The tracker lists 1 tracked segment, 76 km long and 1.36 bcm/y of capacity, starting up in 1995. It runs from Carrasco to Yapacaní. It is owned by YPFB Transporte.

Length

76 km

Capacity

1.36 bcm/y

1.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 305 mm (12 in)

Route

Carrasco-Yapacaní Gas Pipeline runs from Carrasco to Yapacaní. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Carrasco
To
Yapacaní
Start country
Bolivia
End country
Bolivia
Countries crossed
Bolivia
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
101 km
GEM pipeline ID
P3123
Start year
1995
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingCarrasco → Yapacaní761.36305 mm1995GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.