Country
Argentina: LNG infrastructure
Argentina has 4 LNG terminals and 50 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 6.1 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
operating liquefaction
Import capacity
6.1 Mtpa
operating regasification
Pipelines
50
27,460 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 2 | — | — |
| Import (regasification) | 2 | 6.1 | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Argentina
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Argentina LNG TerminalRío Negro | Export | Not reported | Proposed | 27.9 Mtpaproposed | 4 | — |
| Dock Sud LNG TerminalBuenos Aires | Import | Not reported | Cancelled | Not reported | 1 | — |
| Escobar FSRUBuenos Aires | Import | FSRU | Operating | 6.1 Mtpa | 1 | 2011 |
| TGS Puerto Galván LNG TerminalBuenos Aires | Export | Not reported | Proposed | 5.4 Mtpaproposed | 2 | — |
Gas pipelines crossing Argentina
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Anillo Gran Buenos Aires Gas PipelineBuchanan → Las Heras | Argentina | Operating | 83 km | Not reported | 1 | 1999 |
| Anillo Gran Buenos Aires Gas PipelineCañuelas → Ezeiza | Argentina | Operating | 29 km | Not reported | 1 | 1989 |
| Argentina LNG Gas PipelineMeseta Buena Esperanza → Sierra Grande | Argentina | Proposed | 527 km | 18.3 bcm/y | 1 | 2028 |
| Atacama Gas PipelineSalta → Mejiones | Argentina, Chile | Operating | 1,167 km | 1.97 bcm/y | 1 | 1999 |
| Bioceánico Gas PipelineCampo Durán → Campo Grande | Argentina, Paraguay, Brazil | Proposed | 1,050 km | 3.65 bcm/y | 1 | 2027 |
| Bioceánico Gas PipelineCampo Durán → Campo Grande | Argentina, Paraguay, Brazil | Proposed | 1,050 km | 7.3 bcm/y | 1 | 2030 |
| Centro Oeste Gas PipelineLoma La Lata → San Jerónimo | Argentina | Operating | 1,121 km | 11.7 bcm/y | 1 | 1981 |
| Chelforó-Conesa Gas PipelineChelforó → Conesa | Argentina | Operating | 220 km | Not reported | 1 | 1952 |
| Cordillerano-Patagónico Gas PipelinePlaza Huincul → Chubut | Argentina | Operating | 940 km | 0.48 bcm/y | 1 | 1986 |
| Cordillerano-Patagónico Gas PipelineEsquel → Chubut | Argentina | Operating | 600 km | 0.37 bcm/y | 1 | 2006 |
| Entrerriano Gas PipelineAldea Brasilera → Colón | Argentina | Operating | 436 km | Not reported | 1 | 1998 |
| Fénix Gas PipelineFénix platform → Vega Pléyade platform | Argentina | Operating | 35 km | 3.65 bcm/y | 1 | 2024 |
| GasAndes PipelineLa Mora → San Bernardo | Argentina, Chile | Operating | 533 km | 3.94 bcm/y | 1 | 1997 |
| Gasoducto Norte Gas PipelineSan Jerónimo → Campo Durán | Argentina | Operating | 1,454 km | 10.2 bcm/y | 1 | 1960 |
| Gasoducto de la Costa Gas PipelineEl Chourrón → Mar del Plata | Argentina | Operating | 680 km | 1.68 bcm/y | 1 | 2004 |
| Gasoducto del Litoral Gas PipelineColón → Paysandú | Argentina, Uruguay | Operating | 27 km | 0.44 bcm/y | 1 | 1998 |
| Gasoducto del PacificoLoma La Lata gasfield → Talcahuano | Argentina, Chile | Operating | 670 km | 2.74 bcm/y | 1 | 1999 |
| Juana Azurduy Gas PipelineCampo Grande (Yacuiba) → Campo Durán | Bolivia, Argentina | Operating | 52 km | 0.28 bcm/y | 1 | 2011 |
| La Carlota-Tío Pujio Gas PipelineLa Carlota → Tío Pujio | Argentina | Operating | 123 km | 5.84 bcm/y | 1 | 2024 |
| Medanito-Mainqué Gas PipelineMedanito → Mainqué | Argentina | Operating | 135 km | Not reported | 1 | 1969 |
| Mercedes-Cardales Gas PipelineBuenos Aires → Cardales | Argentina | Operating | 73 km | 5.48 bcm/y | 1 | 2023 |
| Neuba I Gas PipelineSierra Barrosa → Ezeiza | Argentina | Operating | 1,267 km | 4.75 bcm/y | 1 | 1970 |
| Neuba II Gas PipelineLa Yegua → Las Heras | Argentina | Operating | 1,958 km | 10.9 bcm/y | 1 | 1988 |
| Neuba II Gas PipelineBuenos Aires → Carlos Casares | Argentina | Operating | 38 km | 1.83 bcm/y | 1 | 2023 |
| NorAndino Gas PipelinePichanal compressor station → Tocopilla and Mejillones | Argentina, Chile | Operating | 1,070 km | 2.92 bcm/y | 1 | 1999 |
| Northeast Argentina Gas PipelineSanto Tomé → Río Bermejo | Argentina | Operating | 694 km | 4.09 bcm/y | 1 | 2019 |
| Northeast Argentina Gas PipelineRío Bermejo → Ibarreta | Argentina | Operating | 280 km | 4.09 bcm/y | 1 | 2024 |
| Northeast Argentina Gas PipelineIbarreta → Campo Durán | Argentina | Shelved | 533 km | 4.09 bcm/y | 1 | — |
| Olavarría-Barker Gas PipelineOlavarría → Barker | Argentina | Operating | 105 km | Not reported | 1 | 1972 |
| Paraná-Uruguayana Gas PipelineParaná → Uruguaiana | Argentina, Brazil | Operating | 437 km | 5.48 bcm/y | 1 | 2000 |
| Perito Moreno Gas PipelineTratayén → Salliqueló | Argentina | Operating | 573 km | 9.49 bcm/y | 1 | 2023 |
| Perito Moreno Gas PipelineChacharramendi → La Carlota | Argentina | Proposed | 280 km | 7.3 bcm/y | 1 | — |
| Perito Moreno Gas PipelineTratayén → Salliqueló | Argentina | Proposed | 569 km | 7.3 bcm/y | 1 | 2027 |
| Plaza Huincul-Senillosa Gas PipelinePlaza Huincul → Senillosa | Argentina | Operating | 67 km | Not reported | 1 | 1993 |
| Puna Gas PipelineSusques → Salar de Pocitos | Argentina | Operating | 186 km | 0.1 bcm/y | 1 | 2007 |
| San Jerónimo-General Pacheco Gas PipelineSan Jerónimo → General Pacheco | Argentina | Operating | 294 km | Not reported | 1 | — |
| San Jerónimo-General Rodríguez Gas PipelineSan Jerónimo → General Rodríguez | Argentina | Operating | 328 km | Not reported | 1 | — |
| San Jerónimo-Santa Fe-Paraná Gas PipelineSan Jerónimo → Aldea Brasilera | Argentina | Operating | 191 km | Not reported | 1 | — |
| San Martin PipelineSan Sebastián → Gutierrez | Argentina | Operating | 4,590 km | 11.2 bcm/y | 1 | 1965 |
| San Matías Gas PipelineTratayén → San Antonio Oeste | Argentina | Proposed | 480 km | 9.86 bcm/y | 1 | 2028 |
| San Sebastián-Ushuaia Gas PipelineSan Sebastián → Ushuaia | Argentina | Operating | 280 km | Not reported | 1 | 1981 |
| Santa Cruz Norte Gas PipelinePico Truncado → Los Antiguos | Argentina | Shelved | 320 km | Not reported | 1 | — |
| Santa Cruz Sur Gas PipelineCampo Boleadoras → El Calafate | Argentina | Operating | 181 km | 0.26 bcm/y | 1 | 2006 |
| Santa Cruz Sur Gas PipelineEsperanza → El Turbio | Argentina | Operating | 178 km | 0.26 bcm/y | 1 | 2009 |
| Second Transmagallánico Gas PipelineCabo Espiritu Santo → Cabo Vírgenes | Argentina | Operating | 37 km | 2.53 bcm/y | 1 | 2010 |
| Southern Cross Gas PipelineBuenos Aires → Montevideo | Argentina, Uruguay | Operating | 400 km | 1.83 bcm/y | 1 | 2002 |
| Valles Calchaquíes Gas PipelineLa Candelaria → San Carlos | Argentina | Proposed | 197 km | 0.18 bcm/y | 1 | — |
| Vega Pléyade Gas PipelineVega Pléyade platform → Rio Cullen and Cañadon Alfa gas processing plants | Argentina | Operating | 77 km | 3.65 bcm/y | 1 | 2016 |
| Vicuñas Gas PipelineSusques → Antofagasta de la Sierra | Argentina | Proposed | 304 km | 1.46 bcm/y | 1 | 2027 |
| Yabog Gas PipelineRío Grande → Yacuíba | Bolivia, Argentina | Operating | 540 km | 2.19 bcm/y | 1 | 1972 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.