Gas transmission pipeline · San Jerónimo to General Rodríguez
San Jerónimo-General Rodríguez Gas Pipeline
San Jerónimo-General Rodríguez Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 328 km long. It runs from San Jerónimo to General Rodríguez. It is owned by TGN (Transportadora de Gas del Norte SA).
Length
328 km
Capacity
Not reported
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
San Jerónimo-General Rodríguez Gas Pipeline runs from San Jerónimo to General Rodríguez. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- San Jerónimo
- To
- General Rodríguez
- Start country
- Argentina
- End country
- Argentina
- Countries crossed
- Argentina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 345 km
- GEM pipeline ID
- P7844
- Start year
- Not reported
- GEM wiki page
- Not reported
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | San Jerónimo → General Rodríguez | 328 | Not reported | 762 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.