Gas transmission pipeline · Plaza Huincul to Senillosa
Plaza Huincul-Senillosa Gas Pipeline
Plaza Huincul-Senillosa Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 67 km long, starting up in 1993. It runs from Plaza Huincul to Senillosa. It is owned by TGS (Transportadora de Gas del Sur SA).
Length
67 km
Capacity
Not reported
Segments tracked
1
Largest diameter 203 mm (8.0 in)
Route
Plaza Huincul-Senillosa Gas Pipeline runs from Plaza Huincul to Senillosa. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Plaza Huincul
- To
- Senillosa
- Start country
- Argentina
- End country
- Argentina
- Countries crossed
- Argentina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 67 km
- GEM pipeline ID
- P7848
- Start year
- 1993
- GEM wiki page
- Not reported
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Plaza Huincul → Senillosa | 67 | Not reported | 203 mm | 1993 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.