Gas transmission pipeline · Tratayén to Salliqueló
Perito Moreno Gas Pipeline
Perito Moreno Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 573 km long and 9.49 bcm/y of capacity, starting up in 2023. It runs from Tratayén to Salliqueló. It is owned by Enarsa (Energía Argentina SA).
Length
573 km
Capacity
9.49 bcm/y
7.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Perito Moreno Gas Pipeline runs from Tratayén to Salliqueló. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tratayén
- To
- Salliqueló
- Start country
- Argentina
- End country
- Argentina
- Countries crossed
- Argentina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 571 km
- GEM pipeline ID
- P1247
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 1 | Operating | Tratayén → Salliqueló | 573 | 9.49 | 914 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.