LNG Chain

By status

Idle LNG infrastructure

7 LNG terminals in 6 countries totalling 33.9 Mtpa and 8 gas pipelines totalling 2,936 km are idle. Terminals are sorted by capacity, pipelines by length, vessels by cargo capacity.

7 idle LNG terminals

Showing 7 terminals.

Import / exportTypeUnits
Mina Al-Ahmadi LNG TerminalAl AhmadiKuwaitImportNot reportedIdle9.6 Mtpa22009
Northeast Gateway LNG TerminalMassachusettsUnited StatesImportNot reportedIdle6.08 Mtpa12008
Terminal Gás Sul FSRUSanta CatarinaBrazilImportFSRUIdle6 Mtpa12024
Aqaba Jordan FSRUAqabaJordanImportFSRUIdle3.8 Mtpa12015
Hadera FSRU TerminalSharonIsraelImportFSRUIdle3.8 Mtpa12013
Marshal Vasilevskiy FSRUKaliningrad OblastRussiaImportFSRUIdle3.76 Mtpa12019
Vysotsk LNG TerminalLeningrad OblastRussiaExportNot reportedIdle0.82 Mtpa32019

8 idle gas pipelines

CountriesSegments
Yamal-Europe Gas PipelineTorzhok → Frankfurt an der OderRussia, Belarus, Germany, PolandIdle1,660 km33 bcm/y11999
Bayu-Undan to Darwin PipelineTimor Sea → DarwinAustraliaIdle502 km4.75 bcm/y12005
Guaymas-El Oro PipelineGuaymas → El OroMexicoIdle331 km5.3 bcm/y12017
Yemen LNG Gas PipelineSafer → BalhafYemenIdle320 km11.7 bcm/y12009
ANR Gas PipelineWest Cameron Block 167 → Grand Chenier liquids handling facilityUnited StatesIdle64 km7.39 bcm/y1
UTOS Gas PipelineGulf of Mexico → Johnson's BayouUnited StatesIdle47 km20.4 bcm/y11978
Port Kembla Pipeline ProjectSpringhill Road → Kembla Grange Meter StationAustraliaIdle7.8 km4.87 bcm/y12023
Port Kembla Pipeline ProjectPort Kembla → Springhill RoadAustraliaIdle4.3 km4.87 bcm/y12023