LNG Chain

Gas transmission pipeline · Fénix platform to Vega Pléyade platform

Fénix Gas Pipeline

Fénix Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 35 km long and 3.65 bcm/y of capacity, starting up in 2024. It runs from Fénix platform to Vega Pléyade platform. It is owned by TotalEnergies, Harbour Energy plc and Pan American Energy.

Length

35 km

Capacity

3.65 bcm/y

2.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Fénix Gas Pipeline runs from Fénix platform to Vega Pléyade platform. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Fénix platform
To
Vega Pléyade platform
Start country
Argentina
End country
Argentina
Countries crossed
Argentina
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
40 km
GEM pipeline ID
P4195
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingFénix platform → Vega Pléyade platform353.65610 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.