Country
Colombia: LNG infrastructure
Colombia has 12 LNG terminals and 26 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 3.61 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
operating liquefaction
Import capacity
3.61 Mtpa
0.91 Mtpa under construction
Pipelines
26
9,052 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 1 | — | — |
| Import (regasification) | 11 | 3.61 | 0.91 |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Colombia
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Amazónica LNG TerminalMagdalena | Import | Not reported | Proposed | 1.14 Mtpaproposed | 1 | — |
| Andes Energy LNG TerminalValle del Cauca | Import | Not reported | Proposed | Not reported | 1 | — |
| Ballena FSRULa Guajira | Import | FSRU | Proposed | 2.28 Mtpaproposed | 1 | — |
| Caribe LNG TerminalSucre | Import | Not reported | Under construction | 0.46 Mtpaunder construction | 1 | — |
| Cartagena FSRU (Colombia)Bolivar | Import | FSRU | Operating | 3.61 Mtpa | 3 | 2016 |
| Ciénaga FSRUMagdalena | Import | FSRU | Proposed | 3.04 Mtpaproposed | 1 | — |
| Colombia FLNG TerminalAtlántico | Export | FLNG | Cancelled | Not reported | 1 | — |
| Coveñas FSRUSucre | Import | FSRU | Proposed | 3.04 Mtpaproposed | 2 | — |
| El Viajano Altenesol LNG TerminalCordoba | Import | Not reported | Cancelled | Not reported | 1 | — |
| Puerto Bahía LNG TerminalBolívar | Import | Not reported | Proposed | 2.28 Mtpaproposed | 2 | — |
| Puerto Brisa LNG TerminalLa Guajira | Import | Not reported | Proposed | 4.86 Mtpaproposed | 2 | — |
| Regasificadora del Pacífico LNG TerminalValle del Cauca | Import | Not reported | Under construction | 0.46 Mtpaunder construction | 1 | — |
Gas pipelines crossing Colombia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Bogotá - SNT Magdalena MedioBogotá → Mariquita | Colombia | Proposed | 105 km | 2.2 bcm/y | 1 | 2030 |
| Buenaventura-Yumbo Gas PipelineBuenaventura → Yumbo | Colombia | Proposed | 100 km | 4.09 bcm/y | 1 | 2030 |
| Cúcuta - SNT Magdalena MedioCúcuta → San Alberto | Colombia | Proposed | 100 km | 0.08 bcm/y | 1 | 2030 |
| Northwestern Gas PipelineJobo → Medellín | Colombia | Cancelled | 289 km | 1.02 bcm/y | 1 | 2023 |
| Northwestern Gas PipelineMedellín → Mariquita | Colombia | Cancelled | 139 km | Not reported | 1 | 2028 |
| Northwestern Gas PipelineMariquita → Bogotá | Colombia | Cancelled | 105 km | Not reported | 1 | 2028 |
| Progasur Gas Pipeline | Colombia | Operating | 288 km | Not reported | 1 | — |
| Promigas Pipeline NetworkJobo → Majaguas | Colombia | Operating | 85 km | 1.02 bcm/y | 1 | 2019 |
| Promigas Pipeline NetworkBallena → Jobo | Colombia | Operating | 2,537 km | 9.73 bcm/y | 1 | 1977 |
| Promigas Pipeline NetworkMamonal → Caracolí | Colombia | Operating | 135 km | 1.02 bcm/y | 1 | 2020 |
| PromiorienteBarrancabermeja → Gibraltar | Colombia | Operating | 335 km | 0.61 bcm/y | 1 | — |
| TGI Pipeline NetworkBarrancabermeja → Ballena | Colombia | Operating | 771 km | 2.66 bcm/y | 1 | 1996 |
| TGI Pipeline NetworkBarrancabermeja → Neiva | Colombia | Operating | 1,120 km | 4.46 bcm/y | 1 | 1996 |
| TGI Pipeline NetworkMariquita → Jamundí | Colombia | Operating | 797 km | 1.72 bcm/y | 1 | 1997 |
| TGI Pipeline NetworkTunja → Belén | Colombia | Operating | 305 km | 0.65 bcm/y | 1 | 2000 |
| TGI Pipeline NetworkCusiana → La Belleza | Colombia | Operating | 406 km | 4.01 bcm/y | 1 | 2000 |
| TGI Pipeline NetworkMorichal → Yopal | Colombia | Operating | 13 km | 0.05 bcm/y | 1 | 1994 |
| TGI Pipeline NetworkAguazul → Usme | Colombia | Operating | 409 km | 0.31 bcm/y | 1 | 1995 |
| TGI Pipeline NetworkCogua → Soacha | Colombia | Operating | 150 km | 1.43 bcm/y | 1 | 2000 |
| TGI Pipeline NetworkSan Pablo → San Vicente de Chucurí | Colombia | Operating | 51 km | Not reported | 1 | 1997 |
| TGI Pipeline NetworkEstación Centauros → Granada | Colombia | Operating | 60 km | Not reported | 1 | 1997 |
| TGI Pipeline NetworkAguazul → Yopal | Colombia | Proposed | 28 km | 0.14 bcm/y | 1 | 2026 |
| Trans-Caribbean Gas PipelineBallena gas fields → Maracaibo | Venezuela, Colombia | Mothballed | 224 km | 5 bcm/y | 1 | 2007 |
| TransmetanoSebastopol → Rionegro | Colombia | Operating | 190 km | 0.8 bcm/y | 1 | — |
| TransoccidenteMariquita-Cali gas pipeline → Cali | Colombia | Operating | 11 km | 0.76 bcm/y | 1 | — |
| VIM - InteriorJobo → Vasconia | Colombia | Proposed | 300 km | 1.02 bcm/y | 1 | 2027 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.