Gas transmission pipeline · Barrancabermeja to Ballena
TGI Pipeline Network
TGI Pipeline Network is an operating gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 771 km long and 2.66 bcm/y of capacity, starting up in 1996. It runs from Barrancabermeja to Ballena. It is owned by TGI SAS E.S.P.
Length
771 km
Capacity
2.66 bcm/y
2.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 457 mm (18 in)
Route
TGI Pipeline Network runs from Barrancabermeja to Ballena. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Barrancabermeja
- To
- Ballena
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 758 km
- GEM pipeline ID
- P1254
- Start year
- 1996
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Ballena-Barrancabermeja | Operating | Barrancabermeja → Ballena | 771 | 2.66 | 457 mm | 1996 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ballena FSRU | Colombia | Import | Proposed | 17.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- TGI SAS E.S.P100%