Gas transmission pipeline · Jobo to Medellín

Northwestern Gas Pipeline

Northwestern Gas Pipeline is a cancelled gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 289 km long and 1.02 bcm/y of capacity, starting up in 2023. It runs from Jobo to Medellín. It is owned by Canacol Energy.

Length

289 km

Capacity

1.02 bcm/y

0.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 559 mm (22 in)

Route

Northwestern Gas Pipeline runs from Jobo to Medellín. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jobo
To
Medellín
Start country
Colombia
End country
Colombia
Countries crossed
Colombia
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
267 km
GEM pipeline ID
P2185
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase 1CancelledJobo → Medellín2891.02559 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies