LNG Chain

Gas transmission pipeline · Horia to Recaș

BRUA Gas Pipeline

BRUA Gas Pipeline is a cancelled gas transmission pipeline in Romania. The tracker lists 1 tracked segment, 50 km long and 2.65 bcm/y of capacity, starting up in 2022. It runs from Horia to Recaș. It is owned by SNTGN Transgaz SA.

Length

50 km

Capacity

2.65 bcm/y

1.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 800 mm (31 in)

Route

BRUA Gas Pipeline runs from Horia to Recaș. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Horia
To
Recaș
Start country
Romania
End country
Romania
Countries crossed
Romania
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
46 km
GEM pipeline ID
P2277
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase 2CancelledHoria → Recaș502.65800 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies