Romania: LNG infrastructure
Romania has 1 LNG terminal and 32 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
operating regasification
Pipelines
32
12,025 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 1 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Romania
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Constanta LNG TerminalDobruja | Import | Not reported | Cancelled | Not reported | 1 | — |
Gas pipelines crossing Romania
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Arad-Szeged Gas PipelineArad → Szeged | Romania, Hungary | Operating | 109 km | 4.5 bcm/y | 1 | 2010 |
| BRUA Gas Extra PipelineArad → Recas | Romania | Operating | 45 km | 15.6 bcm/y | 1 | — |
| BRUA Gas PipelinePodișor → Horia | Romania | Operating | 479 km | 1.75 bcm/y | 1 | 2020 |
| BRUA Gas PipelineHoria → Recaș | Romania | Cancelled | 50 km | 2.65 bcm/y | 1 | 2022 |
| BRUA Gas PipelineOnesti → Nadlac | Romania | Proposed | 843 km | 5.32 bcm/y | 1 | 2023 |
| Bacau Gas Pipeline | Romania | Operating | 31 km | 0.16 bcm/y | 1 | 2004 |
| Black Sea Shore-Podisor PipelineBlack sea shore → Podisor | Romania | Under construction | 308 km | 14.8 bcm/y | 1 | 2027 |
| Eastring Pipeline | Slovakia, Hungary, Romania, Bulgaria, Türkiye | Proposed | 1,208 km | 20 bcm/y | 1 | 2027 |
| Gas Interconnector Bulgaria-RomaniaGiurgiu → Ruse | Romania, Bulgaria | Operating | 30 km | 1.5 bcm/y | 1 | 2013 |
| Giurgiu-Ruse Gas PipelineMuntenia → Ruse | Romania, Bulgaria | Operating | 26 km | 1.5 bcm/y | 1 | 2016 |
| Hust–Satu Mare Gas PipelineHust → Satu Mare | Romania, Ukraine | Operating | 21 km | 2 bcm/y | 1 | 1999 |
| Mediesu Aurit–Khust Gas PipelineMediesu Aurit → Khust | Romania | Operating | 45 km | Not reported | 1 | — |
| Midia Gas Pipeline | Romania | Operating | 126 km | 1 bcm/y | 1 | 2022 |
| Nabucco Gas PipelineAhiboz, Gölbaşı → Baumgarten an der March | Türkiye, Bulgaria, Romania, Austria, Hungary | Cancelled | 3,893 km | 31 bcm/y | 1 | — |
| North–Vest Romania PipelineHoria → Mediesu Aurit | Romania | Proposed | 518 km | Not reported | 1 | 2023 |
| Podisor–Giurgiu Gas PipelinePodisor → Giurgiu | Romania | Operating | 58 km | Not reported | 1 | — |
| Romania-Moldova Gas PipelineIasi → Ungheni | Romania | Operating | 33 km | Not reported | 1 | 2015 |
| Romania-Moldova Gas PipelineUngheni → Chisinau | Romania, Moldova | Operating | 120 km | 1.5 bcm/y | 1 | 2021 |
| Romania-Serbia Interconnection Gas PipelineRecas → Mokrin | Romania, Serbia | Proposed | 97 km | 1.6 bcm/y | 1 | 2023 |
| Romania-Ukraine InterconnectorKhotyn → Siret | Ukraine, Romania | Cancelled | 30 km | 2.81 bcm/y | 1 | 2025 |
| Romania-Ukraine InterconnectorOnești → Letcani | Romania | Operating | 165 km | Not reported | 1 | 2021 |
| Romania-Ukraine InterconnectorGheraesti → Siret | Romania | Cancelled | 146 km | Not reported | 1 | 2026 |
| Romanian National Transmission SystemSilistea → Onesti | Romania | Operating | 148 km | Not reported | 1 | — |
| Romanian National Transmission SystemOnesti → Coroi | Romania | Operating | 175 km | Not reported | 1 | — |
| Romanian National Transmission SystemCoroi → Jupa | Romania | Operating | 217 km | Not reported | 1 | — |
| Romanian National Transmission SystemJupa → Podisor | Romania | Operating | 348 km | Not reported | 1 | — |
| Romanian National Transmission SystemCoroi → Satu | Romania | Operating | 240 km | Not reported | 1 | — |
| Romanian National Transmission SystemPodisor → Silistea | Romania | Operating | 204 km | Not reported | 1 | — |
| Romanian National Transmission SystemCoroi → Podisor | Romania | Operating | 270 km | Not reported | 1 | — |
| Romanian National Transmission SystemOnesti → Letcani | Romania | Operating | 167 km | Not reported | 1 | — |
| Trans-Balkan Gas Pipeline | Türkiye, Bulgaria, Romania | Operating | 638 km | 27 bcm/y | 1 | 1988 |
| White Stream Gas PipelineTbilisi → Constanța | Georgia, Romania | Cancelled | 1,238 km | 32 bcm/y | 1 | 2023 |
Chokepoint exposure