Gas transmission pipeline · Tbilisi to Constanța
White Stream Gas Pipeline
White Stream Gas Pipeline is a cancelled gas transmission pipeline crossing Georgia, Romania. The tracker lists 1 tracked segment, 1,238 km long and 32 bcm/y of capacity, starting up in 2023. It runs from Tbilisi to Constanța. It is owned by SNTGN Transgaz SA and ITOCHU Corp.
Length
1,238 km
Capacity
32 bcm/y
23.5 Mtpa LNG equivalent
Segments tracked
1
Route
White Stream Gas Pipeline runs from Tbilisi to Constanța. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tbilisi
- To
- Constanța
- Start country
- Georgia
- End country
- Romania
- Countries crossed
- Georgia, Romania
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,138 km
- GEM pipeline ID
- P0732
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Tbilisi → Constanța | 1,238 | 32 | — | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Constanta LNG Terminal | Romania | Import | Cancelled | 1.9 km | route proximity |
| Kulevi LNG Terminal | Georgia | Import | Cancelled | 18 km | route proximity |