Gas transmission pipeline · Tbilisi to Constanța

White Stream Gas Pipeline

White Stream Gas Pipeline is a cancelled gas transmission pipeline crossing Georgia, Romania. The tracker lists 1 tracked segment, 1,238 km long and 32 bcm/y of capacity, starting up in 2023. It runs from Tbilisi to Constanța. It is owned by SNTGN Transgaz SA and ITOCHU Corp.

Length

1,238 km

Capacity

32 bcm/y

23.5 Mtpa LNG equivalent

Segments tracked

1

Route

White Stream Gas Pipeline runs from Tbilisi to Constanța. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tbilisi
To
Constanța
Start country
Georgia
End country
Romania
Countries crossed
Georgia, Romania
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,138 km
GEM pipeline ID
P0732
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledTbilisi → Constanța1,238322023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Constanta LNG TerminalRomaniaImportCancelled1.9 kmroute proximity
Kulevi LNG TerminalGeorgiaImportCancelled18 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.