LNG Chain

Gas transmission pipeline · Libhošť to Kędzierzyn

Czech-Polish Interconnector Gas Pipeline (CPI)

Czech-Polish Interconnector Gas Pipeline (CPI) is a proposed gas transmission pipeline crossing Czechia, Poland. The tracker lists 1 tracked segment, 207 km long, starting up in 2022. It runs from Libhošť to Kędzierzyn. It is owned by Net4Gas and Gaz-System.

Length

207 km

Capacity

Not reported

Segments tracked

1

Largest diameter 991 mm (39 in)

Route

Czech-Polish Interconnector Gas Pipeline (CPI) runs from Libhošť to Kędzierzyn. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Libhošť
To
Kędzierzyn
Start country
Czech Republic
End country
Poland
Countries crossed
Czechia, Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
233 km
GEM pipeline ID
P1699
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedLibhošť → Kędzierzyn207Not reported991 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Polish Baltic Sea Coast FSRUPolandImportUnder constructionname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.