Gas transmission pipeline · Mitino to Yermakovo
Gorky-Cherepovets Gas Pipeline
Gorky-Cherepovets Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 60 km long and 11.27 bcm/y of capacity, starting up in 2026. It runs from Mitino to Yermakovo. It is owned by Gazprom PJSC.
Length
60 km
Capacity
11.3 bcm/y
8.3 Mtpa LNG equivalent
Segments tracked
1
Route
Gorky-Cherepovets Gas Pipeline runs from Mitino to Yermakovo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mitino
- To
- Yermakovo
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 647 km
- GEM pipeline ID
- P4012
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Burmakino-Rybinsk Gas Pipeline | Proposed | Mitino → Yermakovo | 60 | 11.3 | — | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%