LNG Chain

Gas transmission pipeline · Nizhny Novgorod to Cherepovets

Gorky-Cherepovets Gas Pipeline

Gorky-Cherepovets Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 582 km long, starting up in 1961. It runs from Nizhny Novgorod to Cherepovets. It is owned by Gazprom PJSC.

Length

582 km

Capacity

Not reported

Segments tracked

1

Largest diameter 720 mm (28 in)

Route

Gorky-Cherepovets Gas Pipeline runs from Nizhny Novgorod to Cherepovets. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Nizhny Novgorod
To
Cherepovets
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
631 km
GEM pipeline ID
P2310
Start year
1961
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNizhny Novgorod → Cherepovets582Not reported720 mm1961GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies