Gas transmission pipeline · Hermanowice to Strachocina
Hermanowice-Strachocina Pipeline
Hermanowice-Strachocina Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 72 km long, starting up in 2020. It runs from Hermanowice to Strachocina. It is owned by Gaz-System.
Length
72 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1000 mm (39 in)
Route
Hermanowice-Strachocina Pipeline runs from Hermanowice to Strachocina. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hermanowice
- To
- Strachocina
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 59 km
- GEM pipeline ID
- P1350
- Start year
- 2020
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Hermanowice → Strachocina | 72 | Not reported | 1000 mm | 2020 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%