Gas transmission pipeline · Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd
Krasny Most-Sevkar-Berd Gas Pipeline
Krasny Most-Sevkar-Berd Gas Pipeline is an operating gas transmission pipeline in Armenia. The tracker lists 1 tracked segment, 62 km long and 1.71 bcm/y of capacity, starting up in 1993. It runs from Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd. It is owned by CJSC Gazprom Armenia.
Length
62 km
Capacity
1.71 bcm/y
1.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1000 mm (39 in)
Route
Krasny Most-Sevkar-Berd Gas Pipeline runs from Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi to Berd. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi
- To
- Berd
- Start country
- Armenia
- End country
- Armenia
- Countries crossed
- Armenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 61 km
- GEM pipeline ID
- P4268
- Start year
- 1993
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Kransy Most/ Qırmızı Körpü/ Tsiteli Khidi → Berd | 62 | 1.71 | 1000 mm | 1993 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Gazprom PJSC100%