Armenia: LNG infrastructure

Armenia has 6 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.

Export capacity

no export terminal tracked

Import capacity

no import terminal tracked

Pipelines

6

798 km tracked

Fleet

0

0 flagged, 0 owned from here

Import and export balance

DirectionTerminalsOperatingUnder construction
Export (liquefaction)0
Import (regasification)0

Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.

Gas pipelines crossing Armenia

Any pipeline whose country list includes this country, including transit pipelines that only pass through.

CountriesSegments
Ghazakh-Yerevan Gas PipelineGazakh → YerevanArmeniaOperating180 km4.7 bcm/y11960
Ilichevsk-Yerevan Gas PipelineSarur → YerevanArmeniaOperating87 kmNot reported11984
Iran-Armenia Gas PipelineTabriz → SardarianIran, ArmeniaOperating141 km2.27 bcm/y12007
Krasny Most-Sevkar-Berd Gas PipelineKransy Most/ Qırmızı Körpü/ Tsiteli Khidi → BerdArmeniaOperating62 km1.71 bcm/y11993
North Caucasus-Transcaucasia Gas PipelineMozdok → TbilisiRussia, Georgia, ArmeniaOperating271 kmNot reported11965
Vanadzor-Gyumri Gas PipelineVanadzor → GyumriArmeniaOperating58 km0 bcm/y11963