Gas transmission pipeline · Tabriz to Sardarian
Iran-Armenia Gas Pipeline
Iran-Armenia Gas Pipeline is an operating gas transmission pipeline crossing Iran, Armenia. The tracker lists 1 tracked segment, 141 km long and 2.27 bcm/y of capacity, starting up in 2007. It runs from Tabriz to Sardarian. It is owned by Iran Ministry of Petroleum and Gazprom PJSC.
Length
141 km
Capacity
2.27 bcm/y
1.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 700 mm (28 in)
Route
Iran-Armenia Gas Pipeline runs from Tabriz to Sardarian. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tabriz
- To
- Sardarian
- Start country
- Iran
- End country
- Armenia
- Countries crossed
- Iran, Armenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 92 km
- GEM pipeline ID
- P0449
- Start year
- 2007
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Tabriz → Sardarian | 141 | 2.27 | 700 mm | 2007 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.