LNG Chain

Gas transmission pipeline · Asaluyeh to Nawabshah

Iran-Pakistan Pipeline

Iran-Pakistan Pipeline is an under construction gas transmission pipeline crossing Iran, Pakistan. The tracker lists 1 tracked segment, 2,775 km long and 7.67 bcm/y of capacity, starting up in 2024. It runs from Asaluyeh to Nawabshah. It is owned by Iran Ministry of Petroleum.

Length

2,775 km

Capacity

7.67 bcm/y

5.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

Iran-Pakistan Pipeline runs from Asaluyeh to Nawabshah. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Asaluyeh
To
Nawabshah
Start country
Iran
End country
Pakistan
Countries crossed
Iran, Pakistan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,780 km
GEM pipeline ID
P0452
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionAsaluyeh → Nawabshah2,7757.671422 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Kangan LNG TerminalIranExportShelved0.4 kmroute proximity
Persian NIOC LNG TerminalIranExportCancelled0.4 kmroute proximity
South Pars LNG TerminalIranExportCancelled7.7 kmroute proximity
Daewoo Gas LNG TerminalPakistanImportCancelled13.9 kmroute proximity
Pakistan State Oil LNG TerminalPakistanImportCancelledname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.