LNG Chain

Export terminal · Bushehr Province, Iran

Iran NIOC LNG Terminal

Iran NIOC LNG Terminal is an under construction LNG export terminal in Bushehr Province, Iran. The tracker lists 3 tracked units with 12.3 Mtpa under construction. Owners include Iran Pension Fund Organization, National Iranian Gas Exports Company, Iran Pension Fund Investment Organization and others.

Operating

no units operating

Under construction

12.3 Mtpa

16.7 bcm/y · 3 units

Proposed

no units proposed

At a glance

Country
Iran
State / province
Bushehr Province
Region
Not reported
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Under construction
Trains / phases tracked
3
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
27.7555° N, 52.1449° E
GEM terminal ID
T100000130583
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit T1Under construction5.47.34Not reportedIran Pension Fund Organization [50%]; National Iranian Gas Exports Company [49%]; Iran Pension Fund Investment Organization [1%]
Unit T2Under construction5.47.34Not reportedIran Pension Fund Organization [50%]; National Iranian Gas Exports Company [49%]; Iran Pension Fund Investment Organization [1%]
Unit T3Under construction1.52.04Not reportedIran Pension Fund Organization [50%]; National Iranian Gas Exports Company [49%]; Iran Pension Fund Investment Organization [1%]

Capacity by status

StatusUnitsMtpabcm/y
Under construction312.316.7

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Iran NIOC LNG Terminal at 27.7555° N, 52.1449° E, with 8 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
27.7555° N, 52.1449° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
IGAT 5 Gas PipelineOperating540 km34.68 bcm/y1.9 kmroute proximity
IGAT 6 Gas PipelineOperating1,082 km39.7 bcm/y1.9 kmroute proximity
IGAT 9 Gas PipelineUnder construction1,863 km39.7 bcm/y1.9 kmroute proximity
Iran–Iraq–Syria Gas PipelineCancelled5,600 km40.15 bcm/y4.1 kmroute proximity
IGAT 10 Gas PipelineOperating632 km25.55 bcm/y15.5 kmroute proximity
IGAT 2 Gas PipelineOperating1,039 km32.85 bcm/y15.5 kmroute proximity
IGAT 3 Gas PipelineOperating1,267 km32.85 bcm/y15.5 kmroute proximity
Persian Gas PipelineCancelled3,300 km40 bcm/y21.2 kmroute proximity