Gas transmission pipeline · Iran – Türkiye – Greece – Italy – Switzerland – Austria – Germany – France – Spain
Persian Gas Pipeline
Persian Gas Pipeline is a cancelled gas transmission pipeline crossing Iran, Türkiye, Greece and 6 more. The tracker lists 1 tracked segment, 3,300 km long and 40 bcm/y of capacity. It is owned by Iran Ministry of Petroleum.
Length
3,300 km
Capacity
40 bcm/y
29.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
Persian Gas Pipeline runs from Iran – Türkiye – Greece – Italy – Switzerland – Austria – Germany – France – Spain. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Asaluyeh
- To
- Not reported
- Start country
- Iran
- End country
- Spain
- Countries crossed
- Iran, Türkiye, Greece, Italy, Switzerland, Austria, Germany, France, Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 7,427 km
- GEM pipeline ID
- P0457
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Asaluyeh → ? | 3,300 | 40 | 1422 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Kangan LNG Terminal | Iran | Export | Shelved | 1.6 km | route proximity |
| Persian NIOC LNG Terminal | Iran | Export | Cancelled | 1.6 km | route proximity |
| Panigaglia LNG Terminal | Italy | Import | Operating | 3.2 km | route proximity |
| South Pars LNG Terminal | Iran | Export | Cancelled | 4.1 km | route proximity |
| Taranto LNG Terminal | Italy | Import | Proposed | 6.7 km | route proximity |
| Toscana FSRU | Italy | Import | Operating | 18.4 km | route proximity |
| North Pars LNG Terminal | Iran | Export | Cancelled | 20.7 km | route proximity |
| Iran NIOC LNG Terminal | Iran | Export | Under construction | 21.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.