Gas transmission pipeline · Iran – Azerbaijan
Rasht-Chelavend Gas Pipeline
Rasht-Chelavend Gas Pipeline is an operating gas transmission pipeline crossing Iran, Azerbaijan. The tracker lists 1 tracked segment, 150 km long and 5.5 bcm/y of capacity, starting up in 2024. It is owned by National Iranian Gas Company.
Length
150 km
Capacity
5.5 bcm/y
4.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Rasht-Chelavend Gas Pipeline runs from Iran – Azerbaijan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Gilan
- To
- Not reported
- Start country
- Iran
- End country
- Azerbaijan
- Countries crossed
- Iran, Azerbaijan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 146 km
- GEM pipeline ID
- P5984
- Start year
- 2024
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Gilan → ? | 150 | 5.5 | 1067 mm | 2024 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.