Country
Austria: LNG infrastructure
Austria has 23 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
no import terminal tracked
Pipelines
23
13,691 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
Gas pipelines crossing Austria
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Auerstal-Kronstorf Gas Pipeline | Austria | Operating | 185 km | Not reported | 1 | 2014 |
| Austria–Slovenia Interconnector (SOL) Gas PipelineMurfeld → Cersak | Austria, Slovenia | Proposed | 28 km | Not reported | 1 | 2028 |
| Austria–Slovenia Interconnector (SOL) Gas PipelineMurfeld → Cersak | Austria, Slovenia | Operating | 28 km | Not reported | 1 | 1978 |
| Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI)Baumgarten → Breclav | Austria, Czechia | Shelved | 62 km | 6.5 bcm/y | 1 | 2026 |
| Gänserndorf-Simmering Gas PipelineGänserndorf → Simmering | Austria | Operating | 120 km | Not reported | 1 | 2011 |
| Hoscht-St.Magrethen Gas PipelineHoscht → St.Magrethen | Austria, Switzerland | Operating | 6 km | Not reported | 1 | — |
| Hungary-Austria Interconnector Gas PipelineBaumgarten an der March → Deutsch-Jahrndorf | Austria | Operating | 45 km | 4.26 bcm/y | 1 | 1996 |
| Hungary-Austria Interconnector Gas PipelineMosonmagyarovar → Budapest | Austria, Hungary | Operating | 184 km | 4.26 bcm/y | 1 | 1996 |
| Lanzhot–Plavecky Peter Gas PipelineLanzhot → Plavecky Peter | Slovakia, Austria | Operating | 34 km | Not reported | 1 | — |
| Lindau-Daleu Gas PipelineLindau → Daleu | Austria, Switzerland | Operating | 67 km | Not reported | 1 | — |
| Nabucco Gas PipelineAhiboz, Gölbaşı → Baumgarten an der March | Türkiye, Bulgaria, Romania, Austria, Hungary | Cancelled | 3,893 km | 31 bcm/y | 1 | — |
| Penta-West Gas PipelineUberackern → Oberkappel | Austria | Operating | 95 km | Not reported | 1 | 1999 |
| Persian Gas Pipeline | Iran, Türkiye, Greece, Italy, Switzerland, Austria, Germany, France, Spain | Cancelled | 3,300 km | 40 bcm/y | 1 | — |
| Rankweil-Lienz Gas PipelineRankweil → Lienz | Austria, Switzerland | Operating | 8.4 km | Not reported | 1 | — |
| South Stream Gas PipelineAnapa → Tarvisio and Baumgarten an der March | Russia, Bulgaria, Serbia, Hungary, Croatia, Slovakia, Slovenia, Austria, Greece, Italy | Cancelled | 2,380 km | 63 bcm/y | 1 | — |
| Tauern Gas PipelineHaiming → Tarvisio | Germany, Austria, Italy | Cancelled | 290 km | 11.4 bcm/y | 1 | — |
| Tesla Gas PipelineLüleburgaz → Baumgarten an der March | Türkiye, Greece, Serbia, Hungary, Austria | Cancelled | 1,400 km | 27 bcm/y | 1 | 2019 |
| Trans-Austria Gas PipelineBaumgarten an der March → Arnoldstein | Austria | Operating | 380 km | 13.7 bcm/y | 1 | 1974 |
| Trans-Austria Gas PipelineBaumgarten an der March → Arnoldstein | Austria | Operating | 380 km | 13.7 bcm/y | 1 | — |
| Trans-Austria Gas PipelineBaumgarten an der March → Arnoldstein | Austria | Operating | 380 km | 13.7 bcm/y | 1 | 2007 |
| West Austria Gas PipelineBaumgarten an der March → Oberkappel | Austria | Operating | 245 km | 10.9 bcm/y | 1 | 1980 |
| West Austria Gas PipelineOberkappel → Bad Leonfelden | Austria | Proposed | 40 km | 2.5 bcm/y | 1 | 2027 |
| West Austria Gas PipelineBaumgarten an der March → Oberkappel | Austria | Operating | 140 km | 10.9 bcm/y | 1 | 1980 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.