LNG Chain

Gas transmission pipeline · Haiming to Tarvisio

Tauern Gas Pipeline

Tauern Gas Pipeline is a cancelled gas transmission pipeline crossing Germany, Austria, Italy. The tracker lists 1 tracked segment, 290 km long and 11.4 bcm/y of capacity. It runs from Haiming to Tarvisio. It is owned by Tauern Gas Pipeline.

Length

290 km

Capacity

11.4 bcm/y

8.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 900 mm (35 in)

Route

Tauern Gas Pipeline runs from Haiming to Tarvisio. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Haiming
To
Tarvisio
Start country
Germany
End country
Italy
Countries crossed
Germany, Austria, Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
660 km
GEM pipeline ID
P1326
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledHaiming → Tarvisio29011.4900 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.