Gas transmission pipeline · Baumgarten to Breclav

Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI)

Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI) is a shelved gas transmission pipeline crossing Austria, Czechia. The tracker lists 1 tracked segment, 62 km long and 6.5 bcm/y of capacity, starting up in 2026. It runs from Baumgarten to Breclav. It is owned by Gas Connect Austria GmbH and Net4Gas.

Length

62 km

Capacity

6.5 bcm/y

4.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 800 mm (32 in)

Route

Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI) runs from Baumgarten to Breclav. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Baumgarten
To
Breclav
Start country
Austria
End country
Czech Republic
Countries crossed
Austria, Czechia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
116 km
GEM pipeline ID
P1693
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineShelvedBaumgarten → Breclav626.5800 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.