Gas transmission pipeline · Baumgarten an der March to Deutsch-Jahrndorf
Hungary-Austria Interconnector Gas Pipeline
Hungary-Austria Interconnector Gas Pipeline is an operating gas transmission pipeline in Austria. The tracker lists 1 tracked segment, 45 km long and 4.26 bcm/y of capacity, starting up in 1996. It runs from Baumgarten an der March to Deutsch-Jahrndorf. It is owned by Gas Connect Austria GmbH.
Length
45 km
Capacity
4.26 bcm/y
3.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 700 mm (28 in)
Route
Hungary-Austria Interconnector Gas Pipeline runs from Baumgarten an der March to Deutsch-Jahrndorf. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Baumgarten an der March
- To
- Deutsch-Jahrndorf
- Start country
- Austria
- End country
- Austria
- Countries crossed
- Austria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 40 km
- GEM pipeline ID
- P3967
- Start year
- 1996
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Austrian segment | Operating | Baumgarten an der March → Deutsch-Jahrndorf | 45 | 4.26 | 700 mm | 1996 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Verbund AG51%
- Allianz SE29.4%
- Snam SpA19.6%