Gas transmission pipeline · Siri Island to Asaluyeh
Siri–Asaluyeh Gas Pipeline
Siri–Asaluyeh Gas Pipeline is an operating gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 305 km long and 5.42 bcm/y of capacity, starting up in 2013. It runs from Siri Island to Asaluyeh. It is owned by National Iranian Gas Company.
Length
305 km
Capacity
5.42 bcm/y
4.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 813 mm (32 in)
Route
Siri–Asaluyeh Gas Pipeline runs from Siri Island to Asaluyeh. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Siri Island
- To
- Asaluyeh
- Start country
- Iran
- End country
- Iran
- Countries crossed
- Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 316 km
- GEM pipeline ID
- P3949
- Start year
- 2013
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Siri Island → Asaluyeh | 305 | 5.42 | 813 mm | 2013 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Kangan LNG Terminal | Iran | Export | Shelved | 1.6 km | route proximity |
| Persian NIOC LNG Terminal | Iran | Export | Cancelled | 1.6 km | route proximity |
| South Pars LNG Terminal | Iran | Export | Cancelled | 6.1 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.