LNG Chain

Gas transmission pipeline · Bordano to Flaibano

Malborghetto-Flaibano Gas Pipeline

Malborghetto-Flaibano Gas Pipeline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 38 km long, starting up in 2026. It runs from Bordano to Flaibano. It is owned by Gazprom PJSC.

Length

38 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1400 mm (55 in)

Route

Malborghetto-Flaibano Gas Pipeline runs from Bordano to Flaibano. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bordano
To
Flaibano
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
60 km
GEM pipeline ID
P5553
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Bordano-Flaibano ExpansionOperatingBordano → Flaibano38Not reported1400 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies