Gas transmission pipeline · Mazara del Vallo to Gagliano
Mazara del Vallo-Gagliano Gas Pipeline
Mazara del Vallo-Gagliano Gas Pipeline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 224 km long, starting up in 1980. It runs from Mazara del Vallo to Gagliano. It is owned by Snam Rete Gas SpA.
Length
224 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1200 mm (47 in)
Route
Mazara del Vallo-Gagliano Gas Pipeline runs from Mazara del Vallo to Gagliano. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mazara del Vallo
- To
- Gagliano
- Start country
- Italy
- End country
- Italy
- Countries crossed
- Italy
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 189 km
- GEM pipeline ID
- P4314
- Start year
- 1980
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Mazara del Vallo → Gagliano | 224 | Not reported | 1200 mm | 1980 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Porto Empedocle LNG Terminal | Italy | Import | Shelved | 13.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Snam SpA100%