LNG Chain

Gas transmission pipeline · Moheshkhali to Anwara

Moheshkhali-Anwara Parallel Gas Pipeline

Moheshkhali-Anwara Parallel Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 79 km long and 12.26 bcm/y of capacity, starting up in 2021. It runs from Moheshkhali to Anwara. It is owned by Gas Transmission Co Ltd (GTCL).

Length

79 km

Capacity

12.3 bcm/y

9.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Moheshkhali-Anwara Parallel Gas Pipeline runs from Moheshkhali to Anwara. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Moheshkhali
To
Anwara
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
81 km
GEM pipeline ID
P3112
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingMoheshkhali → Anwara7912.31067 mm2021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Matarbari GE LNG TerminalBangladeshImportCancelled0.9 kmroute proximity
Pertamina Bangladesh FSRUBangladeshImportCancelled1.7 kmroute proximity
Summit Matarbari LNG TerminalBangladeshImportProposed1.9 kmroute proximity
RPGC Matarbari LNG TerminalBangladeshImportCancelled2.5 kmroute proximity
Summit FSRUBangladeshImportOperating4.1 kmroute proximity
Moheshkhali Floating LNG TerminalBangladeshImportOperating4.8 kmroute proximity
ACWA LNG TerminalBangladeshImportCancelled5.1 kmroute proximity
Kutubdia (Reliance) FSRUBangladeshImportCancelled5.1 kmroute proximity
Kutubdia LNG Terminal (Petronet)BangladeshImportCancelled5.1 kmroute proximity
Summit Matarbari FSRUBangladeshImportProposed9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.