Gas transmission pipeline · United Kingdom
National Transmission System
National Transmission System is an operating gas transmission pipeline in United Kingdom. The tracker lists 1 tracked segment, 7,650 km long, starting up in 1963. It is owned by GasT TopCo.
Length
7,650 km
Capacity
Not reported
Segments tracked
1
Route
National Transmission System runs from United Kingdom. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- United Kingdom
- End country
- United Kingdom
- Countries crossed
- United Kingdom
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 7,680 km
- GEM pipeline ID
- P0801
- Start year
- 1963
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 7,650 | Not reported | — | 1963 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Dragon LNG Terminal | United Kingdom | Import | Operating | 0.3 km | route proximity |
| Grain LNG Terminal | United Kingdom | Import | Operating | 0.3 km | route proximity |
| South Hook LNG Terminal | United Kingdom | Import | Operating | 0.5 km | route proximity |
| Teesside GasPort FSRU | United Kingdom | Import | Proposed | 2 km | route proximity |
| Teesside WaveCrest LNG Terminal | United Kingdom | Import | Proposed | 2.9 km | route proximity |
| Canvey LNG Terminal | United Kingdom | Import | Cancelled | 6.2 km | route proximity |
| Grangemouth FSRU | United Kingdom | Import | Proposed | 8.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- GasT TopCo100%