Gas transmission pipeline · Carrickfergus to Derry
North West Pipeline (NWP)
North West Pipeline (NWP) is an operating gas transmission pipeline in United Kingdom. The tracker lists 1 tracked segment, 112 km long, starting up in 2004. It runs from Carrickfergus to Derry. It is owned by BGE Northern Ireland.
Length
112 km
Capacity
Not reported
Segments tracked
1
Largest diameter 450 mm (18 in)
Route
North West Pipeline (NWP) runs from Carrickfergus to Derry. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Carrickfergus
- To
- Derry
- Start country
- United Kingdom
- End country
- United Kingdom
- Countries crossed
- United Kingdom
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 113 km
- GEM pipeline ID
- P2983
- Start year
- 2004
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Carrickfergus → Derry | 112 | Not reported | 450 mm | 2004 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| North West Shelf LNG Terminal | Australia | Export | Operating | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.