LNG Chain

Gas transmission pipeline · Kirillov to Lipin Bor

Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline

Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 55 km long and 0.74 bcm/y of capacity, starting up in 2023. It runs from Kirillov to Lipin Bor. It is owned by Gazprom PJSC.

Length

55 km

Capacity

0.74 bcm/y

0.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 500 mm (20 in)

Route

Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline runs from Kirillov to Lipin Bor. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kirillov
To
Lipin Bor
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
58 km
GEM pipeline ID
P4077
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Stage II: Kirillov-Lipin Bor Gas PipelineOperatingKirillov → Lipin Bor550.74500 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies