LNG Chain

Gas transmission pipeline · Chyobsara to Kirillov

Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline

Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 118 km long and 0.74 bcm/y of capacity, starting up in 2021. It runs from Chyobsara to Kirillov. It is owned by Gazprom PJSC.

Length

118 km

Capacity

0.74 bcm/y

0.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 500 mm (20 in)

Route

Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline runs from Chyobsara to Kirillov. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Chyobsara
To
Kirillov
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
113 km
GEM pipeline ID
P4076
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Stage I: Sheksna-Kirillov Gas PipelineOperatingChyobsara → Kirillov1180.74500 mm2021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies