Gas transmission pipeline · Ouargla to El-Oued
Southern Algeria Gas Transmission Network
Southern Algeria Gas Transmission Network is an under construction gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 242 km long. It runs from Ouargla to El-Oued. It is owned by Société Algérienne de Gestion du Réseau de Transport du Gaz (GRTG).
Length
242 km
Capacity
Not reported
Segments tracked
1
Largest diameter 711 mm (28 in)
Route
Southern Algeria Gas Transmission Network runs from Ouargla to El-Oued. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ouargla
- To
- El-Oued
- Start country
- Algeria
- End country
- Algeria
- Countries crossed
- Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 271 km
- GEM pipeline ID
- P2060
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Hassi Messaoud-El Oued Gas Pipeline | Under construction | Ouargla → El-Oued | 242 | Not reported | 711 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Southern Finland LNG Terminal | Finland | Import | Cancelled | — | name match |
Owners and operators