Gas transmission pipeline · El-Oued to Taleb Larbi
Southern Algeria Gas Transmission Network
Southern Algeria Gas Transmission Network is an under construction gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 109 km long. It runs from El-Oued to Taleb Larbi. It is owned by Société Algérienne de Gestion du Réseau de Transport du Gaz (GRTG).
Length
109 km
Capacity
Not reported
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Southern Algeria Gas Transmission Network runs from El-Oued to Taleb Larbi. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- El-Oued
- To
- Taleb Larbi
- Start country
- Algeria
- End country
- Algeria
- Countries crossed
- Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 81 km
- GEM pipeline ID
- P2061
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| El Oued-Taleb El Arbi Gas Pipeline | Under construction | El-Oued → Taleb Larbi | 109 | Not reported | 406 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Southern Finland LNG Terminal | Finland | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.