LNG Chain

Gas transmission pipeline · El-Oued to Taleb Larbi

Southern Algeria Gas Transmission Network

Southern Algeria Gas Transmission Network is an under construction gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 109 km long. It runs from El-Oued to Taleb Larbi. It is owned by Société Algérienne de Gestion du Réseau de Transport du Gaz (GRTG).

Length

109 km

Capacity

Not reported

Segments tracked

1

Largest diameter 406 mm (16 in)

Route

Southern Algeria Gas Transmission Network runs from El-Oued to Taleb Larbi. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
El-Oued
To
Taleb Larbi
Start country
Algeria
End country
Algeria
Countries crossed
Algeria
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
81 km
GEM pipeline ID
P2061
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
El Oued-Taleb El Arbi Gas PipelineUnder constructionEl-Oued → Taleb Larbi109Not reported406 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Southern Finland LNG TerminalFinlandImportCancelledname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.