Gas transmission pipeline · Jiashi County to Makit County
Tarim Basin Rim Gas Pipeline Network
Tarim Basin Rim Gas Pipeline Network is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 155 km long, starting up in 2013. It runs from Jiashi County to Makit County.
Length
155 km
Capacity
Not reported
Segments tracked
1
Route
Tarim Basin Rim Gas Pipeline Network runs from Jiashi County to Makit County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Jiashi County
- To
- Makit County
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 155 km
- GEM pipeline ID
- P6605
- Start year
- 2013
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Jiashi-Yuepu Lake-Megaiti Branch | Operating | Jiashi County → Makit County | 155 | Not reported | — | 2013 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.