LNG Chain

Gas transmission pipeline · Aksu to Awat County

Tarim Basin Rim Gas Pipeline Network

Tarim Basin Rim Gas Pipeline Network is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 44 km long and 0.06 bcm/y of capacity, starting up in 2018. It runs from Aksu to Awat County.

Length

44 km

Capacity

0.06 bcm/y

0.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 168 mm (6.6 in)

Route

Tarim Basin Rim Gas Pipeline Network runs from Aksu to Awat County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Aksu
To
Awat County
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
42 km
GEM pipeline ID
P6606
Start year
2018
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Awat BranchOperatingAksu → Awat County440.06168 mm2018GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.