Gas transmission pipeline · Aranda to Valladolid
Valladolid–Aranda Gas Pipeline
Valladolid–Aranda Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 87 km long, starting up in 1990. It runs from Aranda to Valladolid. It is owned by Enagás SA.
Length
87 km
Capacity
Not reported
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Valladolid–Aranda Gas Pipeline runs from Aranda to Valladolid. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Aranda
- To
- Valladolid
- Start country
- Spain
- End country
- Spain
- Countries crossed
- Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 87 km
- GEM pipeline ID
- P3067
- Start year
- 1990
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Aranda → Valladolid | 87 | Not reported | 508 mm | 1990 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.