Enagás SA is linked to 9 LNG terminals, 56 pipelines and 0 carriers in the Global Energy Monitor tracker, as owner, operator and parent company, across Albania, Algeria, France, Germany and 8 more.
Terminals linked
9
Pipelines linked
56
14,415 km of route
Operating capacity of linked terminals
56.7 Mtpa
whole-terminal figure, not pro-rated by stake
Carriers linked
0
Countries
12
Profile
- Headquarters
- Not reported
- Ticker
- Not reported
- Website
- Not reported
- Also appears in GEM as
- Enagás
- Roles
- owner, operator, parent company
- Canonicalised by
- automatic (first-seen name)
Linked terminals
Role and percentage exactly as GEM reports per unit; where a stake applies to only some units the unit names are listed.
| Terminal | Country | Type | Status | Role | Stake | Operating Mtpa |
|---|---|---|---|---|---|---|
| Altamira LNG Terminal | Mexico | Import | Operating | Owner | 40% | 5.7 |
| Barcelona LNG Terminal | Spain | Import | Operating | Owner | 100% | 17.1 |
| Operator | — | |||||
| Bilbao LNG Terminal | Spain | Import | Operating | Owner | 50% | 5.15 |
| Cartagena LNG Terminal (Spain) | Spain | Import | Operating | Owner | 100% | 11.8 |
| Operator | — | |||||
| El Musel LNG Terminal | Spain | Import | Operating | Owner | 75% | 5.15 |
| Gran Canaria LNG Terminal | Spain | Import | Cancelled | Owner | 100% | — |
| Huelva LNG Terminal | Spain | Import | Operating | Owner | 100% | 11.8 |
| Operator | — | |||||
| Stade LNG Terminal | Germany | Import | Under construction | Operator | — | — |
| Tenerife LNG Terminal | Spain | Import | Cancelled | Owner | 100% | — |
Linked gas pipelines
Role and percentage exactly as GEM reports per segment.
| Pipeline | Countries | Status | Role | Stake | Length | Capacity |
|---|---|---|---|---|---|---|
| Al Ándalus Gas Pipeline | Spain | Operating | Owner | 100% | 884 | 12 |
| Parent | 100% | |||||
| Alcazar de San Juan-Yela Gas Pipeline | Spain | Operating | Owner | 100% | 174 | — |
| Parent | 100% | |||||
| Algete-Haro Gas Pipeline | Spain | Operating | Owner | 100% | 892 | — |
| Parent | 100% | |||||
| Algete-Yela Gas Pipeline | Spain | Operating | Owner | 100% | 89 | — |
| Parent | 100% | |||||
| Almería-Chinchilla Gas Pipeline | Spain | Operating | Owner | 100% | 336 | — |
| Parent | 100% | |||||
| Aranda–Soria Gas Pipeline | Spain | Operating | Owner | 100% | 126 | — |
| Parent | 100% | |||||
| Baleares Gas Pipeline | Spain | Operating | Owner | 100% | 335 | — |
| Parent | 100% | |||||
| Banyeres–Tamarite Gas Pipeline | Spain | Operating | Owner | 100% | 130 | — |
| Parent | 100% | |||||
| Bilbao–Villapresente Gas Pipeline | Spain | Operating | Owner | 100% | 103 | — |
| Parent | 100% | |||||
| Burgos–Valladolid Gas Pipeline | Spain | Operating | Owner | 100% | 96 | — |
| Parent | 100% | |||||
| Camisea Gas Pipeline | Peru | Operating | Owner | 28.95% | 730 | 15.7 |
| Parent | 28.95% | |||||
| Castelnou-Villar de Arnedo-Haro Gas Pipeline | Spain | Operating | Owner | 100% | 278 | — |
| Parent | 100% | |||||
| Castelnou–Tamarite Gas Pipeline | Spain | Operating | Owner | 100% | 108 | — |
| Parent | 100% | |||||
| Cordoba–Alcazar De San Juan Gas Pipeline | Spain | Operating | Owner | 100% | 255 | — |
| Parent | 100% | |||||
| Cordoba–Puertollano Gas Pipeline | Spain | Operating | Owner | 100% | 104 | — |
| Parent | 100% | |||||
| Eje Levante Gas Pipeline | Spain | Operating | Owner | 100% | 368 | — |
| Parent | 100% | |||||
| Eje Levante Gas Pipeline | Spain | Operating | Owner | 100% | 62 | — |
| Parent | 100% | |||||
| Eje Levante Gas Pipeline | Spain | Operating | Owner | 100% | 79 | — |
| Parent | 100% | |||||
| Eje Levante Gas Pipeline | Spain | Operating | Owner | 100% | 158 | — |
| Parent | 100% | |||||
| Eje Transversal Gas Pipeline | Spain | Operating | Owner | 100% | 268 | — |
| Parent | 100% | |||||
| Getafe-Zarza de Tajo-Cuenca Gas Pipeline | Spain | Operating | Owner | 100% | 172 | — |
| Parent | 100% | |||||
| Green Hysland Pipeline | Spain | Operating | Owner | — | 3.2 | — |
| Parent | — | |||||
| Guitiriz-Lugo Gas Pipeline | Spain | Operating | Owner | 100% | 28 | — |
| Parent | 100% | |||||
| H2Med Pipeline | Spain, France | Proposed | Owner | — | 450 | 2.72 |
| Parent | — | |||||
| Huelva-Córdoba Gas Pipeline | Spain | Operating | Owner | 100% | 494 | — |
| Parent | 100% | |||||
| Irun-Biriatou Gas Pipeline | Spain, France | Operating | Owner | — | 4 | 11.3 |
| Parent | — | |||||
| Lacq–Larrau Gas Pipeline | Spain | Operating | Owner | — | 108 | 5.96 |
| Parent | — | |||||
| Larrau–Villar de Arnedo Gas Pipeline | France, Spain | Operating | Owner | — | 145 | — |
| Parent | — | |||||
| Madrid–Algete Gas Pipeline | Spain | Operating | Owner | 100% | 44 | — |
| Parent | 100% | |||||
| Maghreb-Europe Gas Pipeline | Algeria, Morocco, Spain, Portugal | Operating | Owner | — | 1,350 | 12 |
| Parent | — | |||||
| Martorell–Figueres Gas Pipeline | Spain | Operating | Owner | 100% | 94 | — |
| Parent | 100% | |||||
| Midi-Catalonia Pipeline | Spain, France | Cancelled | Owner | — | 1,250 | 7.5 |
| Parent | — | |||||
| Midi-Catalonia Pipeline | Spain, France | Cancelled | Owner | — | 227 | — |
| Parent | — | |||||
| Oviedo–Tuy Gas Pipeline | Spain | Operating | Owner | 100% | 373 | — |
| Parent | 100% | |||||
| País Vasco Gas Pipeline | Spain | Operating | Owner | 100% | 267 | — |
| Parent | 100% | |||||
| Puertollano–Madrid Gas Pipeline | Spain | Operating | Owner | 100% | 240 | — |
| Parent | 100% | |||||
| Reganosa Gas Pipeline | Spain | Operating | Owner | 100% | 40 | — |
| Parent | 100% | |||||
| Reganosa Gas Pipeline | Spain | Operating | Owner | 100% | 30 | — |
| Parent | 100% | |||||
| Reganosa Gas Pipeline | Spain | Operating | Owner | 100% | 45 | — |
| Parent | 100% | |||||
| Reganosa Gas Pipeline | Spain | Operating | Owner | 100% | 25 | — |
| Parent | 100% | |||||
| Ruta de la Plata Gas Pipeline | Spain | Operating | Owner | 100% | 597 | — |
| Parent | 100% | |||||
| Ruta de la Plata Gas Pipeline | Spain | Operating | Owner | 100% | 80 | — |
| Parent | 100% | |||||
| Ruta de la Plata Gas Pipeline | Spain | Operating | Owner | 100% | 59 | — |
| Parent | 100% | |||||
| Spain-Portugal Interconnector Gas Pipeline | Spain, Portugal | Cancelled | Owner | 100% | 86 | — |
| Parent | 100% | |||||
| Tamarite–Serrablo Gas Pipeline | Spain | Operating | Owner | 100% | 119 | — |
| Parent | 100% | |||||
| Tivissa-Barcelona Gas Pipeline | Spain | Operating | Owner | 100% | 427 | — |
| Parent | 100% | |||||
| Tivissa–Castelnou Gas Pipeline | Spain | Operating | Owner | 100% | 91 | — |
| Parent | 100% | |||||
| Trans-Adriatic Gas Pipeline | Türkiye, Greece, Albania, Italy | Operating | Parent | 20% | 878 | 10 |
| Valladolid–Aranda Gas Pipeline | Spain | Operating | Owner | 100% | 87 | — |
| Parent | 100% | |||||
| Vergara-Irun Gas Pipeline | Spain | Operating | Owner | 100% | 89 | — |
| Parent | 100% | |||||
| Villapresente-Burgos Gas Pipeline | Spain | Operating | Owner | 100% | 140 | — |
| Parent | 100% | |||||
| Villapresente–Oviedo Gas Pipeline | Spain | Operating | Owner | 100% | 145 | — |
| Parent | 100% | |||||
| Villar de Arnedo–Haro Gas Pipeline | Spain | Operating | Owner | 100% | 76 | — |
| Parent | 100% | |||||
| Yela–Villar de Arnedo Gas Pipeline | Spain | Operating | Owner | 100% | 251 | — |
| Parent | 100% | |||||
| Zamora–Valladolid Gas Pipeline | Spain | Operating | Owner | 100% | 79 | — |
| Parent | 100% | |||||
| Zaragoza–Serrablo Gas Pipeline | Spain | Operating | Owner | 100% | 247 | — |
| Parent | 100% |