Gas transmission pipeline · Huelva to Cordoba

Huelva-Córdoba Gas Pipeline

Huelva-Córdoba Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 494 km long, starting up in 1988. It runs from Huelva to Cordoba. It is owned by Enagás SA.

Length

494 km

Capacity

Not reported

Segments tracked

1

Largest diameter 102 mm (4.0 in)

Route

Huelva-Córdoba Gas Pipeline runs from Huelva to Cordoba. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Huelva
To
Cordoba
Start country
Spain
End country
Spain
Countries crossed
Spain
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
206 km
GEM pipeline ID
P1580
Start year
1988
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingHuelva → Cordoba494Not reported102 mm1988GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Huelva LNG TerminalSpainImportOperating8.6 kmroute proximity