Import terminal · Texas, United States
Bay Crossing LNG Terminal
Bay Crossing LNG Terminal is a cancelled LNG import terminal in Texas, United States. The tracker lists 1 tracked unit; capacity is not reported. It is owned by BP.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- United States
- State / province
- Texas
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 29.2811° N, 94.8258° W
- GEM terminal ID
- T100000130846
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 9.6 | 13.1 | — | — | Not reported | BP PLC [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 9.6 | 13.1 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- BP100%
Location
Bay Crossing LNG Terminal at 29.2811° N, 94.8258° W, with 8 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 29.2811° N, 94.8258° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Tejas Gas Pipeline | Operating | 5,221 km | 1.23 bcm/y | 4.9 km | route proximity |
| Natural Gas Pipeline Company of America System | Operating | 14,645 km | 16.35 bcm/y | 20.7 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 8,530 km | 10.83 bcm/y | 22.2 km | route proximity |
| Gulf Crossing Pipeline | Operating | 568 km | 17.64 bcm/y | — | name match |
| Mississippi Crossing Project | Proposed | 335 km | 21.46 bcm/y | — | name match |
| Norte Crossing Pipeline | Operating | 0 km | 3.74 bcm/y | — | name match |
| Sabine Crossing Gas Pipeline | Proposed | 89 km | 27.59 bcm/y | — | name match |
| Valley Crossing Pipeline | Operating | 275 km | 26.57 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Panama Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.