Gas transmission pipeline · Texas to Chicago
ANR Gas Pipeline
ANR Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 2,897 km long and 61.32 bcm/y of capacity, starting up in 1949. It runs from Texas to Chicago. It is owned by ANR Pipeline Co.
Length
2,897 km
Capacity
61.3 bcm/y
45.1 Mtpa LNG equivalent
Segments tracked
1
Route
ANR Gas Pipeline runs from Texas to Chicago. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Texas
- To
- Chicago
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 11,724 km
- GEM pipeline ID
- P0152
- Start year
- 1949
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main Line | Operating | Texas → Chicago | 2,897 | 61.3 | — | 1949 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Beacon Port LNG Terminal | United States | Import | Cancelled | 0.2 km | route proximity |
| G2 LNG Terminal | United States | Export | Cancelled | 0.4 km | route proximity |
| Monkey Island LNG Terminal | United States | Export | Proposed | 1.6 km | route proximity |
| Creole Trail LNG Terminal | United States | Import | Cancelled | 3.4 km | route proximity |
| Gulf Gateway Deepwater Port LNG Terminal | United States | Import | Retired | 3.4 km | route proximity |
| CP2 LNG Terminal | United States | Export | Under construction | 3.8 km | route proximity |
| Calcasieu Pass LNG Terminal | United States | Export | Operating | 3.9 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 4.2 km | route proximity |
| Alturas LNG Terminal | United States | Export | Cancelled | 4.4 km | route proximity |
| Sabine Pass LNG Terminal | United States | Export | Operating | 4.5 km | route proximity |
| Commonwealth LNG Terminal | United States | Export | Under construction | 4.9 km | route proximity |
| Argent LNG Terminal | United States | Export | Proposed | 5.2 km | route proximity |
| Fourchon LNG Terminal | United States | Export | Cancelled | 5.2 km | route proximity |
| Golden Pass LNG Terminal | United States | Export | Operating | 6.4 km | route proximity |
| Cameron LNG Terminal | United States | Export | Operating | 8.9 km | route proximity |
| Magnolia LNG Terminal | United States | Export | Proposed | 9 km | route proximity |
| Lake Charles LNG Terminal | United States | Import | Mothballed | 9.8 km | route proximity |
| Woodside Louisiana LNG Terminal | United States | Export | Under construction | 10 km | route proximity |
| Port Pelican LNG Terminal | United States | Import | Cancelled | 10.3 km | route proximity |
| Grand Isle Deepwater Port Terminal | United States | Export | Cancelled | 12.5 km | route proximity |
| Blue Marlin Offshore Port | United States | Export | Proposed | 14.4 km | route proximity |
| Phillips 66 Beamont Oil Terminal | United States | Export | Operating | 17.6 km | route proximity |
| Avocet FLNG Terminal | United States | Export | Cancelled | 23.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- ANR Pipeline Co100%
Parent companies
- TC Energy Corp100%